Crane A can unload a ship in 10 hours and crane B can unload it in 14 hours. How long will it take the two cranes to unload the ship working together?

1 Answer
Sep 4, 2016

35/6" hrs. = 5 hrs., 50 mnts."356 hrs. = 5 hrs., 50 mnts.

Explanation:

Crane A can unload a ship in 1010 hrs.

:." Crane A can unload "1/10" of the ship in "1 hr.

Similarly, Crane B can unload 1/14" of the ship in "1 hr.

Hence, both the cranes together can unload

1/10+1/14=12/70=6/35 of the ship in 1 hr.

Therefore, both the cranes work together, the ship will be completely unloaded in 35/6" hrs. = 5 hrs., 50 mnts."