Physics help question 4?
A building under construction requires building materials to be raised to the upper floors by cranes or elevators. An amount of cement is lifted 86.3 m by a crane, which exerts a force on the cement that is slightly larger than the weight of the cement. If the network done on the cement is 1.89 X 103 J, what is the magnitude of the net force exerted on the cement?
A building under construction requires building materials to be raised to the upper floors by cranes or elevators. An amount of cement is lifted 86.3 m by a crane, which exerts a force on the cement that is slightly larger than the weight of the cement. If the network done on the cement is 1.89 X 103 J, what is the magnitude of the net force exerted on the cement?
2 Answers
Feb 5, 2018
The force on the cement must have been 21.9 N
Explanation:
The relation between work done, force exerted and displacement is
so, the force exerted to do the work must be
#F=W/d = (1.89xx10^3J)/86.3 m = 21.9 N
Feb 5, 2018